Submit your article  Contact us 
Automotive
Business
Communications
Computers & Technology
Education
Entertainment
Finance
Food & Drink
Health & Fitness
Home & Family
Babies
Elder Care
Gardening
Hobbies
Holidays
Home Improvement
Home Security
Interior & Decorating
Parenting
Pets
Internet
Kids & Teens
Law & Legal
News & Society
Self Improvement
Shopping
Sports & Recreation
Travel & Leisure
Women's Interests
Writing
  

Planning Permission and Building Regulations for Conservatories in the UK

Posted by  Search EzineArticles.com   on: 2005-08-12 18:45:16


Do I need planning permission for a conservatory?

Do I need Building Regulation approval for a conservatory

To help you understand these issues I detail below some of the "conditions" attached to planning permission and building regulations. (These apply to England/Wales only) Scottish, Irish and North American regulations are quite different – You should in all instances take local advice.

PLANNING PERMISSION

In England and Wales you will not usually require planning permission, provided you do not exceed the permitted development limit for your property (which is 50-70m cubed, depending on where you live). Notable exceptions to the above are listed buildings and conservation areas. Please note that if your property has been extended in the past - you will have used up some or perhaps all of your "permitted development" area and may need permission. Its also worth noting that occasionally “permitted development” rights may be withdrawn from a property and any extension however small needs planning. If in doubt check.

BUILDING REGULATIONS

Generally speaking conservatories/sunrooms on residential property are exempted under Building Regulations. Below are some of the Exemption Criteria - under the Building Regulations 1991 (as amended). These criteria must be met for a conservatory extension to be classified as exempt:

a) The extension has a completely transparent or translucent roof.
b) The extension walls are substantially glazed. (Should not have more than 25 % of its wall area as brick work)
c) The extension has a floor area not exceeding 30m squared.
d) The extension is sited at ground level.
e) The extension is permanently separated from the remainder of the property by means of a door.
f) The extension is not permanently heated!
g) The glazing satisfies the requirements of part N, Schedule 1 (toughened/safety glass)
h) The extension does not contain any drainage facilities. (i.e. sink, WC, or washing machine)

An example of where building regulation approval may be required is a Kitchen / Conservatory Extension. I suggest you contact your local council - explain your intentions - they will be able to give you more specific advice.

One word of "warning" - a fair number of people will have constructed conservatories with drainage inside, more than 25 % brick wall area and permanent heating. In a lot of instances they will not have got the approvals required - either because they where unaware or badly advised. I believe building control officers are taking these situations more seriously - leading to structures be taken down in the most severe instances.

Barry Dunlop is the Founder of ConservatoriesOnline.com - The online place for people interested in conservatories, sunrooms, garden rooms, and orangeries. Find more tips and advice at his website: http://www.conservatoriesonline.com




Related Articles



Planning Permission Tips UK: The Value of Design Statements When Submitting a Planning Application
Planning Your In Wall Speaker System
Planning Permission Tips UK Conservatories Dispelling a Myth
Planning Permission Tips Uk How To Select A Property to Extend or Develop
10 Things To Consider Before Planning And Installing A New Bathroom
Planning Permission Tips UK What To Show And What Not To Show On Your application Drawings
Planning Permission Tips UK How to Avoid Boundary Disputes when Extending or Redeveloping a Site
Planning Permission Tips UK Permitted Development Allowances Not the Golden Goose You Imagine




Copyright 2005 Articles Magazine